Currently Building

Northside Town Station

Miami, FL

About The Project

Two-Tower, Seven-Story Residential Development At The Gateway To Miami's Northside Metrorail Station. GOPELIA Is Delivering The Full Metals Package: From Elevator Hoist Beams Driven In Early To The Aluminum Balcony, Stair, And Perimeter Railings That Wrap Both Towers. Full Design-Assist Coverage Including Shop Drawings, Fabrication, And Installation, All Coordinated Through Strategic Group Builders.

Client / GCStrategic Group Builders
Owner / DeveloperIMC Equity Group
ArchitectRealization Architects (Rafael Tapanes, AR 97896)
Location3015 NW 79th Street, Miami, FL 33147
BuildingTwo 7-Story Residential Towers (North + South)
Scope Of WorkElevator Hoist Beams & Sump Pit Covers | Pit Access Ladders | 42" Aluminum Horizontal Picket Balcony Railings (Levels 2–7, Both Towers, ~538 LF Each) | 42" Aluminum Vertical Picket Stair Railings (Stairs #1–5) | 1-1/4" Wall-Mounted Handrails | Exterior Pipe Railings | 6' Clubhouse Picket Fence | 6' Building Privacy Fence | Steel Bollards | Dumpster Gate | Pedestrian Gates | Rolling Gates | Pool Deck Pavilion Trellis
Contract Value$750K+ (Full Metals Package)
StatusIn Construction