A Miami-Dade County Notice Of Acceptance (NOA) Is How The County Certifies That A Specific Product Assembly Has Been Tested To The Required TAS Protocols And Is Approved For Use In HVHZ Applications. For Metal Railings In Miami-Dade And Broward, NOA Verification Is Not Optional On Assemblies Where The County Or The Contract Requires It. This Guide Walks A GC, Architect, Or Owner Through The Exact Steps To Verify A Metal Railing NOA And What To Ask Any Fabricator Who Cites An NOA Number.
A Miami-Dade County NOA Is A Product-Specific Approval Issued By The Miami-Dade County Product Control Section For An Assembly That Has Passed The Required TAS (Testing Application Standard) Protocols. Common TAS Protocols For Railings And Related Envelope Products Include TAS 201 Large-Missile Impact, TAS 202 Cyclic Wind Loading, And TAS 203 Uniform Static Air Pressure. An NOA Approves A Specific Assembly With Specific Components, Specific Anchorage, And Specific Design Pressure Limits. An NOA Is Not A Generic Approval For A Category Of Product, It Does Not Cover Modifications Made In The Field, And It Expires On A Fixed Date Unless Renewed.
The Deciding Reference Is The Building Department And The Contract. Read Both Before Making Assumptions.
We Do Not Invent Or Cite NOA Numbers That Are Not Current, Not Applicable, Or Not Verifiable. If An NOA Is Not Available For The Assembly, We Recommend Engineered Design And Coordinate The Permit Path Accordingly.
The Miami-Dade County Product Control Section Publishes The NOA Search On The Miami-Dade County Website. The Search Returns The Approved Assembly, The Manufacturer, The Design Pressures, And The Expiration Date.
No. An NOA Approves A Specific Assembly With Specific Components And Specific Anchorage. Field Substitutions - Different Anchors, Different Base Plates, Different Post Spacing - Void The Approval Unless The Manufacturer Issues An Amended NOA That Covers The Substitution.
Where No Suitable NOA Exists For The Application, The Path Is Site-Specific Engineered Design With PE-Sealed Shop Drawings And Structural Calculations Per ASCE 7-22 And FBC 2023. The Plans Examiner Accepts Or Rejects The Engineered Path At Permit.
Each NOA Carries An Expiration Date - Typically 5 Years - After Which It Must Be Renewed By The Manufacturer To Remain Valid. The Assembly Must Be Approved At The Time Of Permit And At The Time Of Installation.
GOPELIA Installs Railing Assemblies That Carry A Current Miami-Dade NOA Where The Application Requires One. We Verify The NOA At The Time Of Bid. For Custom Assemblies That Are Not Covered By An Existing NOA, We Coordinate Engineered Design With PE-Sealed Shop Drawings.
In Practice, All Three Have A Role. The Fabricator Cites The Assembly And The NOA Number In The Submittal. The Architect And Structural Engineer Review That The Assembly Meets The Design. The GC Confirms The Submittal Is Complete Before Delivering It To The Building Department. The Owner's Best Protection Is To Insist On Verifiable NOA Numbers From The Fabricator, In Writing.
Send Your Drawings, Specs, Or Scope To info@gopelia.com Or Call (305) 925-0801. Standard Bid Turnaround Is 3-5 Business Days For Scoped Packages.